Stock # 586
Capacity 28 Tons per Hour
Products Polymer Grade Propylene (98.25%)

Overview

Never installed and unused C3 Splitter System, designed by Linde AG in 2011. Design capacity was to process 10 tons per hour of Chemical Grade Propylene (CGP) from a nearby Ethylene Plant (including a gaseous recycle stream from PP-Plant) and 18 tons per hour of Refinery Grade Propylene (RGP) from two FCC Plants (including a liquid recycle stream from PP-Plant) to produce Polymer Grade Propylene (PGP - 98.25%). The final propylene product was intended to be suitable for use as a feed in polypropylene plants or other chemical applications. ------------------------------------------ The system offering includes 4 process sections: (1) Dryer, (2) C3 Stripper, (3) C3 Splitter, (4) Treatment; and includes both pretreatment and posttreatment purification stages. All available major equipment is included in the package (see equipment list), as well as all available engineering documentation. Equipment currently under nitrogen blanket.

Major Equipment

(1) FCC Dryer Section
- Inlet Filter
- FCC Dryer
- Particulate Filter
- Dryers Regen Electrical Heater
- Regeneration Heater
- Economizer
- Regeneration Filter
- Regeneration Condenser
- Decanter
-------------------------------------
(2) Stripper Section
- C3 Stripper
- C3 Stripper Condenser
- Stripper Reflux Drum
- C3 Stripper Reflux Pump
- C3 Stripper Reboiler
- Steam Condensate Drum
- C3 Stripper Condensate Pumps (Note: not available)
-------------------------------------
(3) Splitter Section
- C3 Splitter (Note: doesn’t include trays)
- Compressor Suction Drum
- Overhead Compressor
- Propylene Accumulator
- C3 Splitter Trim Condenser
- Propylene Subcooler
- Propylene Product Pumps
- C3 Splitter Reboiler
- Propane Product Pump
-------------------------------------
(4) Treatment Section
- Propylene Adsorber Drums
- Propylene Product Pre-Filter
- Arsine Guard
- Propylene Product Filter
- Propylene Product Trim Cooler
- Absorber Regen Electrical Heater
- Regeneration Feed Effluent Exchanger
- Regeneration Air Cooler
-------------------------------------
(5) Flare Blowdown Section
- Blow Down Drum
- Flare Transfer Drum
- Blow Down Vaporizer
Share
Download Plant Brochure |
SPECIFICATIONS RESOURCES
Year Built
2013
Year Shut
2013
Capacity
28 Tons per Hour